Install: 1.5 Ton 12 SEER R-410A Air Conditioner with UV, air purifier, filter rack, float switch. Suncoast Home Services INCLUDES: Manufacturers warranty on all parts for 10 years, 5 years labor warranty, electric heater, digital programmable WiFi thermostat, first preventive maintenance, all permit running, sit for inspection, liability and worker’s compensation insurance, hurricane code strapping, inline emergency float switch and removal of existing equipment. Rebate is trade in on existing equipment. All work is done by Suncoast employees.
Mounted small appliance outlet for kitchen. Also mounted fridge outlet box secured, hood, dedicated line making a material list for what I need to complete the kitchen job.
Install new panel capable of handing code required breakers for a level 2 remodel. Pulling new neutrals will be required to accommodate new breakers. Waiting on blueprints to do official take off. To include Arc Fault and Dual Function Breakers
(2) Bedrooms Install fan box in middle of room with switch leg Guest bedroom Walk in closet Install 2 high hats in a row Hall Bathroom New duct with exhaust fan (materials supplied by homeowner) Light over vanity mirror w/switch leg (supplied by homeowner) Master Bathroom 2 high hats over shower stall w/switch leg 2 high hats over vanity New exhaust fan w/switch leg (materials by homeowner) install light over mirror Master Bedroom Closet 2 high hats in a row Hallway 2 high hats Kitchen 2 pendant lights over island (materials by homeowner) Livingroom Fan box w/switch leg Left wall (front door) outlet on wall for tv Living Room/kitchen 12 total high hats (3 rows) 2 w/switch legs
Install: 1.5 Ton 12 SEER R-410A Air Conditioner with built in filter rack, float switch. Suncoast Home Services INCLUDES: Manufacturers warranty on all parts for 10 years, 5 years labor warranty, electric heater, digital programmable WiFi thermostat, first preventive maintenance, 1 year supply of filters (total of 12), all permit running, sit for permit, liability and worker’s compensation insurance, hurricane code strapping, inline emergency float switch and removal of existing equipment. Rebate is trade in on existing equipment. All work is done by Suncoast employees.
Install tracks for ceiling in Master bedroom, Master bathroom, Master closet, Guest bedroom, Guest closet, Living room and kitchen. Frame in each location. Includes labor, materials, raceway for electrical wires to pass, and all necessary cut out for lighting. Drywall by others.
Treat all studs with antimicrobial and encapsulate all studs to prevent future mold growth from water damage. * Remove debris * demo & remove any AC duct work in preparation for all new installation
Meter Room Inspection in order to quote a Meter Bank Replacement for HoA