Remove and replace commeruical electric panels of commerical building. Old panels after 20 years old need to be replaced.
7 runs of 3/0 120 feet each in cooper 1 run 1/0 120 feet in copper ** Pull is very long and extremely difficult ** Technicians Notes so far: The Exterior portion between the Office building & the other building Portion already started - where the wire pull through the gutter portion is completed, but Tech's need a larger Stronger Specialty Wire Puller inorder to complete the remaining long underground Extreme Difficulty wire pulls. ** 3-4 Man Job **
Pull electrical permit for Big Bounce America event includes sitting for inspection.
Estimate for Commercial Permits & Inspections Estimates were Approved
Pulling old wire out and replacing with new wire
Replacement of old panels to new GE breaker panels.
115' wire pull new feeder wire for panel. Remove old cloth wiring.