Performed 1st SSA t/u. Delta T: -15°. Tested pan float switch, and made sure electrical connections were tight. Replaced stay clean strip to treat drain line. Cleaned the Evaporator and Condenser coils. Cleared the primary condensate drain line. Tested dual run capacitor(testing within range). Checked the refrigerant levels(meet manufactures specifications). System is operating as it should.