Performed clean & check. Delta T: -16°. Tested pan float switch, and made sure electrical connections were tight. No water or rust in secondary pan. Cleaned the evaporator and condenser coils. Cleared the primary condensate drain line. 45/5 dual run capacitor(44.3MFD-herm, 4.6MFD-fan). 121psig suction pressure(8°SH) which meets manufactures specifications. System is operating as it should.