Performed 1st SSA t/u. Delta T: -20°. Tested pan float switch. Made sure electrical connections were tight. Cleaned the Evaporator and Condenser coils. Cleared the primary condensate drain line. 35/5 dual run capacitor(32.9MFD-herm, 4.98MFD-fan). 120psi suction pressure(6°SH). Which meets manufactures specifications. System is performing as it should.