Performed 2nd SSA t/u. Delta T: -17°. Tested SS2, and made sure electrical connections were tight. Cleaned the evaporator and condenser coils. Cleared the primary condensate drain line. 40/5 dual run capacitor(42.4MFD-herm, 4.9MFD-fan). 314psi head pressure(3°SC) which meets manufacturers specifications. System is operating as it should.