3100 39th Ave North
St. Petersburg, FL 33714
727-822-7700

Job Locations
for st. petersburg, fl


Map of St. Petersburg FL
Wade H.

Wade H.


Job Checkin

Complete low pressure switch replacement. Recover all refrigerant from system. Remove old switch. Install new pressure switch. Remove bypass. Pressure test the system with nitrogen to ensure no leaks. Vacuum down system to 500 microns to ensure a clean line-set. Cycle and inspect equipment. Unit is in normal operating condition.