W119527 JB51393141 Arrived on site to perform diagnostic on transfer switch due to utility power being present in the area, but generator and ATS are still supporting site. Found a main disconnect to be in the off position. After verifying with multiple national power representatives, I was able to turn main disconnect to the on position and transfer power back to utility position. Generator shut down like normal with no issues to be found. Sot is safe and secure, generator and switch are standing by. I also topped off unit with fuel. Unit was at 74% on arrival, I filled it to 86% and added 60.12 gallons of diesel.
calld out after-hours to refuel site generator as it was running due to utility failure. Added 120-gallons
Gene was supposed to do this job but Tyler ended up doing it but it was not booked under this job. Invoiced under a different invoice
Quote for the radiator company to have the radiator tank rebuilt and the time and labor for our techs to install. 8-10 business day lead time to have top radiator tank built
Quote for radiator removal and repair with additional parts THERE IS A 32 DAY LEAD TIME ON THE RADIATOR