Transfer switch needs new control board.
Generator needs new controller. GENE OR CHARLIE NEEDS TO DO THIS JOB IF APPROVED
Found unit has a few small leaks in the hoses. Recommend replacement for upper & lower hoses and new gasket for water heater. Needs 2 gallons of coolant.
Number two service complete. New battery installed. Quote to follow Power Telematic.
Troubleshooting a 20kw liquid-cooled cell-tower Generac generator