403 Headquarters Dr. Unit 5
Millersville, MD 21108
(443) 396-3797

Job Locations
for annapolis, md


Map of Annapolis MD
Alex W.

Alex W.


Job Checkin

I trenched a hole from the house tot he front yard. I came out of the gfci outside I ran a 1/2 pvc pipe out of the side of the box and into the ground. I ran about 30 feet of pvc to a hole where the customer wanted his lamp post. I secured all the pipe with pvc glue then ran a 14-2 UF wire through the pvc. I then mixed and poured concrete in the hole for the post light. I cut of a piece of wood to match the template of the post light bolt base. The. I set the template in the concrete and made sure it was level. I installed a new weather resistant tamper resistant gfci and a in use bubble cover. Also I installed a photo cell out of the gfci box. It is not hooked up yet. We will come back and hook up the wiring and install the post light once the concrete is set. Also we will install a ultra whole home surge protector in the main electrical panel for the customer I also swept the sidewalk and threw away a bunch of weeds the customer pulled out of their garden over the weekend