our hoods are not working properly. there is no suction so all of the smoke is inside the restaurant
EJ was awesome! He was so kind, and very informative the whole time! Thank you EJ!
I am very happy so far with Nelbud, I do get a lot of these type of emails, I rarely have time to sit and fill these out. I would recommend not sending so many. Thanks Dan
This was our first inspections from NelBud and things went as planned. Evan was explaining things as to what he was doing so I could understand. Very pleased and hope to work with you guys till I retire.
Emergency / Exit Lights and Portable Extinguishers Inspection 5: FP Annual 1: FP Annual Inoperable Deficiency for 5: Emergency bad needs replaced. Replace with new Led emergency ligh
Emergency / Exit Lights and Portable Extinguishers Inspection 4: FP Annual - 90 Minute Burn 2: FP Annual
Portable Extinguishers Service Call Tag 2 FE that were missed.
Kitchen Exhaust Cleaning Cleaning KEC Semi Annual - Main
Don't do any fire extinguisher work. If work needs to be done write it up and leave job open bILL WITH FIRE HOSE Portable Extinguishers Inspection FP Annual
Don't do any fire extinguisher work. If work needs to be done write it up and leave job open BILL WITH HYDRANT INSPECTIONS Portable Extinguishers Inspection 16: FP Annual 18
12yr Hydrostatic Test Due: (1) Ansul 3-Gallon System (2013 Manufacture Date) During your most recent Fire Protection Inspection, our technicians noted that one or more of your Fire Suppression Tanks are due for a hydrostatic test per: NFPA 17A: 7.5.1 The following parts of wet chemical extinguishing systems shall be subjected to hydrostatic pressure testing at intervals not exceeding 12 years: Wet Chemical Containers Auxiliary Pressure Containers Hose Assemblies Fire Suppression Tanks are required to be pressure tested using water or some other non-compressible fluid to help prevent unwanted failure or rupture of the cylinder. NFPA 17A also requires the replacement of the cartridge used to expel suppression chemical hoses, o-rings, and burst discs. The proposal below is all-inclusive and includes all parts and labor. You can accept this proposal electronically or contact me directly. Kitchen Suppression Repair Ansul R-102 3 Gallons: The Ansul 3Gal system has a 2013 manufacture da