Job not finished

The ductwork in hood was cleaned, but the fire suppression system is not been checked and tagged. The fire suppression system need to be inspected. That was the main reason to have them here! Yeah, did you take one? Take four

  • Overall Experience
  • Quality
  • Price
  • Convenience

Super friendly & did a great job

  • Overall Experience
  • Quality
  • Price
  • Convenience

Super friendly & did a great job

Came in just in time to get the job done before we got too busy, wasn't rude about us being in his way lol & Always welcome back to our store :)

  • Overall Experience
  • Quality
  • Price
  • Convenience

Job Locations
for haubstadt, in

EV 2.

EV 2. Job Checkin


Dan M.

Dan M. Job Checkin

12yr Hydrostatic Test Past Due: (1) ProTexII L4600 Tank (2011 Manufacture Date) During your most recent Fire Protection Inspection, our technicians noted that one or more of your Fire Suppression Tanks are due for a hydrostatic test per: NFPA 17A: 7.5.1 The following parts of wet chemical extinguishing systems shall be subjected to hydrostatic pressure testing at intervals not exceeding 12 years: Wet Chemical Containers Auxiliary Pressure Containers Hose Assemblies Fire Suppression Tanks are required to be pressure tested using water or some other non-compressible fluid to help prevent unwanted failure or rupture of the cylinder.  NFPA 17A also requires the replacement of the cartridge used to expel suppression chemical hoses, o-rings, and burst discs. Appliance Line-Up & Duct Nozzle Coverage - Deficiency - System Re-Pipe & Nozzles Needed, Detector Needs Properly Centered Under Duct During the semi-annual kitchen fire suppression inspection, the technician identified insufficient noz


Dan M.

Dan M. Job Checkin

Kitchen Suppression, Portable Extinguishers, and Emergency / Exit Lights Inspection FP Semi-Annual FP Annual FP Annual Deficiency: Protex 4600 system is past due for hydrotest 2011. Both duct nozzles are 1h and should be 1L nozzles. Range is only protected by 2 nozzles and should have 3 nozzles per the manufacture specs need to add one 2L nozzle. Detection line is not centered in duct per the manufacture specs line will need to fixed to be in spec. Parts needed Hydrotested protex 4600 tank 2-1L nozzles 1-2L nozzle Cable and conduit for detection line fix.


EV 1.

EV 1. Job Checkin


EV 3.

EV 3. Job Checkin

Kitchen Exhaust Cleaning Cleaning KEC Annual - Dish KEC Semi Annual - Main and Prep


EV 2.