51 Koweba Lane
Indianapolis, IN 46201
(855) 932-6437

Our Top Cities


Local Reviews
for huntingburg, in

Rated 5.0 out of 5 stars based on 1 customer reviews

Best yet

These were the most professional members I've met yet, and i've been working for wendy's for almost two decades. The only thing I saw is that they did not turn the hood brakers back on. Else it was amazing.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Job Locations
for huntingburg, in

Dan M.

Dan M. Job Checkin

12yr Hydrostatic Test Past Due: (Red Tagged) Ansul 6-Gallon System (Out of Compliance) During your most recent Fire Protection Inspection, our technicians noted that one or more of your Fire Suppression Tanks are due for a hydrostatic test per: NFPA 17A: 7.5.1 The following parts of wet chemical extinguishing systems shall be subjected to hydrostatic pressure testing at intervals not exceeding 12 years: Wet Chemical Containers Auxiliary Pressure Containers Hose Assemblies Fire Suppression Tanks are required to be pressure tested using water or some other non-compressible fluid to help prevent unwanted failure or rupture of the cylinder.  NFPA 17A also requires the replacement of the cartridge used to expel suppression chemical hoses, o-rings, and burst discs. Ansul 6 Gallon Suppression System: Manifold / Inline Burst Disc Assembly Needed During the most recent inspection of the suppression system at your location, our technician noted that the (2) Ansul tanks are "hard-piped" togethe


EV 1.

EV 1. Job Checkin


Dan M.

Dan M. Job Checkin

Corrigo Portable Extinguishers, Emergency / Exit Lights, and Kitchen Suppression Inspection 3: FP Annual (3) 6: FP Annual (6) Ansul R102 6 gal: FP Semi Annual Ansul R102 3 gal: FP Semi Annual Deficiency for 6: Ansul 6 Gallon ( Manifolded ) system is 2 years past due for required 12 year maintenance ( 2010 ) System needs In-line burst disk installed to meet Ansul requirements for a manifolded system. Old 2 piece nozzles need to be replaced on Fryer hood. The system is Red-Tagged 1- double tank cartridge 1- in-line Burst Disk 2- Ansulex 2- Tested Tank 2- O-Ring 2- Burst disk 1- regulator test 2- hose assembly 3- 230 nozzle 2- 2120 nozzle 2- 1N nozzle


EV 3.

EV 3. Job Checkin


EV 2.

EV 2. Job Checkin


EV 2.

EV 2. Job Checkin