To start, the team consisted of two members, who arrived a few minutes before scheduled arrival time. They immediately evaluated their work order and viewed the areas to be serviced. Within 10 minutes they had their equipment unloaded and setting up on site. I watched as they covered all of our equipment and work on the cleaning process. Both team members kept focused on the work thru the entire process. As they completed the cleaning and gathered up all of their equipment, they did so as rapidly as when they set up. The site area was left clean and in good order.
Emergency / Exit Lights, Portable Extinguishers, and Kitchen Suppression Inspection 8: FP Annual - (16) Elights 8: FP Annual - (3) Extgrs Ansul R102 3: FP Semi Annual Ansul R102: FP Semi-Annual Ansul R102 3: FP Semi-Annual
12yr Hydrostatic Test Due: (2) Ansul 3-Gallon Systems (2011, 2012 Manufacture Dates) (Griddle & Chicken Fryer Systems) (Each System has 2 Ansul Hoses) During your most recent Fire Protection Inspection, our technicians noted that one or more of your Fire Suppression Tanks are due for a hydrostatic test per: NFPA 17A: 7.5.1 The following parts of wet chemical extinguishing systems shall be subjected to hydrostatic pressure testing at intervals not exceeding 12 years: Wet Chemical Containers Auxiliary Pressure Containers Hose Assemblies Fire Suppression Tanks are required to be pressure tested using water or some other non-compressible fluid to help prevent unwanted failure or rupture of the cylinder. NFPA 17A also requires the replacement of the cartridge used to expel suppression chemical hoses, o-rings, and burst discs. The proposal below is all-inclusive and includes all parts and labor. You can accept this proposal electronically or contact me directly. Kitchen Suppression Rep
Portable Extinguishers, Emergency / Exit Lights, and Kitchen Suppression Inspection 5: FP Annual - (3) Extgrs FP Annual - (16) Elights Ansul R102 3: FP Semi-Annual Ansul R102 3: FP Semi Annual Ansul R102 3: FP Semi-Annual Deficiency for Ansul R102 3: Chicken fryer system and grill hood system both due for hydro test. Both 3 gal system ansul system. Quote for 2 12 year maintenance on 3 gal ansul systems.