I hate to have to write this revview as we usually have great service. Our hood was cleaned last evening and the kitchen was left a mess. Water was all over the floors, the floor mats were saturated with water, floor squeegees were left out. It appeared that the guys did attempt to clean the floor but left the mess. The work tables and equipment were also covered in dirt and grime from the cleaning. This caused my staff extra work this morning before they could start meal prep.
The technician was early for the inspection. He was knowledgeable and polite. He also did not try to add unnecessary charges to the inspection.
The overall service looks good. Although the drip pans on both hoods were not emptied and the excess of water that my employees had to mop up was a bit much.
12-year Hydrostatic Test Past Due: (Red Tagged) Ansul 15-Gallon System (2010 Manufacture Date) During your most recent Fire Protection Inspection, our technicians noted that one or more of your Fire Suppression Tanks are due for a hydrostatic test per: NFPA 17A: 7.5.1 The following parts of wet chemical extinguishing systems shall be subjected to hydrostatic pressure testing at intervals not exceeding 12 years: Wet Chemical Containers Auxiliary Pressure Containers Hose Assemblies Fire Suppression Tanks are required to be pressure tested using water or some other non-compressible fluid to help prevent unwanted failure or rupture of the cylinder. NFPA 17A also requires the replacement of the cartridge used to expel suppression chemical hoses, o-rings, and burst discs. Equipment Line-Up Change - Deficiency System Re-Pipe Needed After the semi-annual kitchen suppression inspection, it was found that the appliance lineup has changed. The kitchen suppression system does not have the corre
Kitchen Suppression Inspection Ansul R102 3: FP Semi Annual Ansul R102 9: FP Semi Annual
Kitchen Suppression Inspection Amerex Kp 375: FP Semi Annual Suggested for Amerex Kp 375: 2 piece Amerex nozzle need updated to new style. Parts 2 griddle ax13729 2 fryer ax13729 1 duct ax16416 2 plenum ax11982
Kitchen Suppression Inspection Ansul R102 3: FP Semi Annual Ansul R102 6: FP Semi Annual Ansul R102 4.5: FP Semi Annual
Kitchen Suppression Inspection Ansul R102 6: FP Semi Annual Ansul R102 6: FP Semi Annual Suggested for Ansul R102 6: 6 gal system one 3 gal tank is due for hydrotest. System is not manifolded. 3 gal tank only due for for hydrotest.
Kitchen Suppression Inspection Ansul R10 15: FP Semi Annual Deficiency for Ansul R10 15: 15 gal system has 3 3- gal 2010 tanks and cartridge that are due for hydrotest. It used to be a 9 gal system. But was updated to. 15 in 2021. Not manifolded qoute as a 9 gal system with double tank cart Range has two 290 nozzles over 6 burner range needs replaced with 3 1F nozzles