FP Semi-Annual FP Annual FP Annual Inoperable Deficiency: Exit sign on back door needs replaced. Inoperable Deficiency: 12 year maintenance on Pyro 350x 2 tanks 2-PCL350 tanks Detection line needs replaced. Failed due to heavy clogged line. 7 total link holders. 30ft conduit. Several appliances need proper protection and non UL nozzles. Fryer needs covered along with 12br range. Red tag issued Kitchen Suppression, Portable Extinguishers, and Emergency / Exit Lights Inspection
Kitchen Suppression Inspection FP Semi-Annual
Kitchen Suppression Inspection FP Semi-Annual
Kitchen Suppression Inspection FP Semi-Annual
Kitchen Suppression Inspection FP Semi-Annual
Kitchen Suppression Inspection FP Semi-Annual
Kitchen Suppression Inspection FP Semi-Annual
Kitchen Suppression Inspection FP Semi-Annual
Kitchen Suppression Inspection FP Semi-Annual
Ansul R102 9g: FP Semi-Annual 5: FP Annual 18: FP Annual Kitchen Suppression, Portable Extinguishers, and Emergency / Exit Lights Inspection
Kitchen Exhaust Cleaning and Swap Pillow Cleaning KEC 9x per year - System 1 April/May/June/July/August/September/October/December/March KEC 9x per year - System 2 April/May/June/July/August/September/October/December/March SWAPP 9x per year - Replace (2) Small Pillows April/May/June/July/August/September/October/December/March
Kitchen Exhaust Cleaning and Swap Pillow Cleaning KEC Every Other Month - System 1 SWAPP Every Other Month - Replace (2) Small Pillow
Kitchen Exhaust Cleaning and Pizza Oven Cleaning KEC Semi-Annual - System 1 PZOVN Semi-Annual - pizza oven detail
Kitchen Exhaust Cleaning Cleaning KEC Quarterly - Kitchen Exhaust Cleaning of Main Hood Only Frequency: Jan/Apr/Jul/Oct ****work orders release on 7th of due month****
Kitchen Exhaust Cleaning and Swap Pillow Cleaning KEC Semi-Annual - System 2 KEC Quarterly - System 1 GRC: Fan Grease Pillow Small