Deficiency Repairs Dry SPK-2 / Pump Room by Loading Dock: Dry sprinkler system is due for 3 year full trip. Pentair 4-481-11A FP-1 / In Pump Room by Loading Dock: (3) missing caps on 2.5” hose valves for fire pump test header. Recommend replacing with plastic caps as brass caps are at risk for theft. Dry SPK-2 / Pump Room by Loading Dock: Return trip to drain all low point drains following full trip of dry sprinkler system.