Fire Suppression Inspection KITCHEN SYSTEM - ZONE 3 R 102 6 G SSBD HYDRO: 2006 new Deficiency: System is non compliant due to both cylinders need hydro testing. As well as the 101-30 co2 cartridge. All are dated from 2006 and are due for hydro every 12 years per NFPA. Systems regulator and hoses will also need to be pressure tested. This test is also required every 12 years.
Fire Suppression Inspection KITCHEN SYSTEM - ZONE 3 R 102 6 G SSBD HYDRO: 2006 new
Fire Suppression Inspection Kitchen System - Zone 3 R 102 6 G SSBD Hydro: (2) 2004 Deficiency: System is non compliant due to system cylinders need hydro testing. Both tanks (3galX2) are dated for 2004 and the double tank co2 cartridge is dated for 2003. All are due for hydrostatic testing every 12 years per nfpa. Regulator pressure test is also needed and is due every 12 years aswell. System piping is missing 2 3/8 seals and the Emt is missing 1 seal.
Fire Suppression Inspection KITCHEN SYSTEM - ZONE 3 R 102 6 G SSBD HYDRO: 2006 new
Fire Suppression Inspection KITCHEN SYSTEM - ZONE 3 R 102 6 G SSBD HYDRO: 2006 new Ansul