26 Hampshire Drive
Hudson, NH 03051
(800)244-7531

Local Reviews
for new london, nh

Rated 5.0 out of 5 stars based on 1 customer reviews

We love Susan

Susan is very professional and knows our campus needs. She is a pleasure to work with making the inspection process seamless and easy for our staff.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Job Locations
for new london, nh

Jim C.

Jim C. Job Checkin


Ben G.

Ben G. Job Checkin


Michael S.

Michael S. Job Checkin


Craig M.

Craig M. Job Checkin

Portable Extinguishers Inspection


Ben G.

Ben G. Job Checkin


Ben G.

Ben G. Job Checkin


Ben G.

Ben G. Job Checkin


Nicholas L.

Nicholas L. Job Checkin

Fire Suppression Inspection KITCHEN SYSTEM - SINGLE TANK ALL INCLUSIVE Deficiency: Range still needs to be moved so that it sits under the protective hood. see pictures


Susan  G.

Susan G. Job Checkin

Portable Extinguishers Inspection annual inspection 1


Susan  G.

Susan G. Job Checkin

Portable Extinguishers Inspection FIRE EXTINGUISHERS - QTY 235


Michael S.

Michael S. Job Checkin


Michael L.

Michael L. Job Checkin

Fire Suppression Repair reconnect hood system Ansul R102 3gal


Nicholas L.

Nicholas L. Job Checkin

Recently one of our licensed technicians was at your location to perform the service on your fire suppression system. During that inspection the following deficiency was found. Fire suppression system cylinders are due for hydro-test. A pressure test, rebuild and refill is required. DOT and the system manufacturer require that these system cylinders are tested every 12 years. Fire Suppression Repair (Both RG6G tanks) Main system is non compliant due to system cylinders need hydro testing. Both tanks are dated 2005 And are due for hydro every 12 years per nfpa. system will also need 2 vent plugs. - repair


Craig M.

Craig M. Job Checkin

Portable Extinguishers Inspection


Nicholas L.

Nicholas L. Job Checkin

Fire Suppression Inspection KITCHEN SYSTEM - ZONE 2 PYRO CHEM PCL 300 - snack shack HYDRO: 2004 R 102 . G SSBD - hot plates HYDRO: 2012 new RG 6.0 G X2 new style - main kitchen HYDRO: 2005 (2) R 102 4.5 G SSBD (X2) - front line HYDRO: 2012 new (2) Deficiency: (Both RG6G tanks) Main system is non compliant due to system cylinders need hydro testing. Both tanks are dated 2005 And are due for hydro every 12 years per nfpa. system will also need 2 vent plugs.