3128 S 6th St
Lincoln, NE 68502
402-423-9192

Local Reviews
for crete, ne

Rated 5.0 out of 5 stars based on 2 customer reviews

Great

Dustin was very knowledgeable about the job he was doing. He answered the questions that I had about the job. I liked how well they cleaned up at the end of the day. Overall I am satisfied with Dustin and Codie's work.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Great communicators, very professional.

I had the epoxy fill on two floor to ceiling foundation cracks as well as a mud jack on the driveway. Work quality is good, Epp did a great job!

  • Overall Experience
  • Quality
  • Price
  • Convenience

Job Locations
for crete, ne

Cole C.

Cole C. Job Checkin

It’s always exciting being able to train the next group of up and comers on the way of how machines work. Auguring holes for plate anchors on a foundation that has failed and moved inward

It’s always exciting being able to train the next group of up and comers on the way of how machines work. Auguring holes for plate anchors on a foundation that has failed and moved inward

Cole C.

Cole C. Job Checkin

Installing plate anchors to stabilize/ gain recovery on a foundation wall that has moved inward

Installing plate anchors to stabilize/ gain recovery on a foundation wall that has moved inward

Erik C.

Erik C. Job Checkin

Installing wall plate anchors today

Installing wall plate anchors today

Cole C.

Cole C. Job Checkin

Pushing out all thread to install plate anchors to stabilize/ gain recovery on a foundation wall that has failed and moved inward

Pushing out all thread to install plate anchors to stabilize/ gain recovery on a foundation wall that has failed and moved inward

Dillon M.

Dillon M. Job Checkin

Post jack in place to level the floor under cabin

Post jack in place to level the floor under cabin

Ross K.

Ross K. Job Checkin

Floor broken out for drain tile installation.

Floor broken out for drain tile installation.

Dillon M.

Dillon M. Job Checkin

Concrete pad poured for post Jacks on cabin

Concrete pad poured for post Jacks on cabin

Ross K.

Ross K. Job Checkin

Dillon is excited to dig footings under this cabin! The footings will support our floor jacks, which will be used to lift and support the structure.

Dillon is excited to dig footings under this cabin! The footings will support our floor jacks, which will be used to lift and support the structure.

Erik C.

Erik C. Job Checkin

Installing a window and window well.

Installing a window and window well.

Dustin A.

Dustin A. Job Checkin

Basement window problems? We have solutions! Call for your free estimate.

Basement window problems?  We have solutions!  Call for your free estimate.

Dustin A.

Dustin A. Job Checkin

Leveled and sealed this driveway today with PolyLift!

Leveled and sealed this driveway today with PolyLift!

Cole C.

Cole C. Job Checkin

Installing temporary I beams to stabilize an inward bowing wall

Installing temporary I beams to stabilize an inward bowing wall

Erik C.

Erik C. Job Checkin

Getting ready to install I-beams today.

Getting ready to install I-beams today.

Dustin P.

Dustin P. Job Checkin

Getting ready to hang vapor barrier

Getting ready to hang vapor barrier

Dustin P.

Dustin P. Job Checkin

Pushing rod for plate anchors

Pushing rod for plate anchors