Bob O. Job Checkin

Monthly maintenance Patient restroom functioning as designed flushed lines and check MIXET valves Patient room Torpedo functioning as designed, flushed lines checked MIXET valves Patient room Belair noticeable corrosion on anglestops, flushed lines and checked MIXET valve Water heater room, flushed tank 3 times with intervols of power flushing. Functioning as designed Lab room functioning as designed flushed lines and checked MIXET Valves, flushed eye wash station. Kitchen sink functioning as designed, flushed lines. Notice of corrosion of angle stops Pt Restroom functioning as designed flushed line, checket mixet valves. And cleared out debri from. Internal screen. Pt Prep room functioning as designed, flushed water lines And check mix it valves Replaced monthly filter whole home water filter.


Bob O.

Bob O. Job Checkin

Technician performed tri annual inspection Restroom one patient side function as designed Flushed lines Checked toilet function as designed Patient room one torpedo Lavatory sink working as designed Flushed lines Patient room to Belair Functioning as designed Flushed lines Bullpen area Angle stops in lav sink our gate valve style recommend replaced quarter turn Flushed lines Flushed eye wash station Lab room Flushed eyewash station, Has gate valve style angle stops recommend replace quarter turn Flushed sink lines Break area, kitchen faucet flushed and functioning as designed PT break room function as design and flushed lines PT restroom function of design, and flushed line Main filter replacedwith new filter Power outages were happening mid inspection


Bob O.

Bob O. Job Checkin

Customer requested repair for PT restroom sensor faucet Technician rebuilt existing fixture twice before coming to the conclusion that unit should be replaced again Technician recommended reschedule while a new Faucet was being ordered


Bob O.

Bob O. Job Checkin

Tech Performed Monthly Maintenance Tech flushed water heater multiple times in order to expel any and all debris and calcium build up. Tech performed manual flush on each and every angle stop in unit. Tech recommend replacement of angle stops in bullpen sink and under lab sink due to shut off not closing properly. Tech tightened multiple faucets. That were loose. Restroom one functioning as designed Patient room1 functioning as designed. Patient room2 functioning as designed. Maintenance room functioning as designed, a lot of sediment was drained out of heater. Shut off valves functioning as designed. Bullpen kitchen functioning as designed Bullpen sink functioning as designed, angle stops under do not close properly. Lab Room functioning as designed, angle stops under do not close properly. Pt Restroom faucet clogged with debris and calcium cleared out and rebuilt. Pt restroom functioning as designed. Pt prep room functioning as desinged. Tighten loose bolts on toilet and seats. T


Bob O.

Bob O. Job Checkin

Due to water scale etching the current fixtures and water system at San Bernardino location technician recommended “tri-annual service” as monthly reoccurring service Customer requested repair for PT restroom sensor faucet Technician rebuilt existing fixture twice before coming to the conclusion that unit should be replaced again Technician recommended reschedule while a new Faucet was being ordered Install new faucet with electronic sensor and mixing valve Technician serviced faucet Tech recommended replacement due to buildup in faucet solenoid Install new faucet with electronic sensor and mixing valve Customer requested repair for PT restroom sensor faucet due to water dripping on the counter continuously Technician rebuilt existing fixture and recommended replacement Due to harsh water quality Due to water quality, technician recommended Faucet replacement


Bob O.

Bob O. Job Checkin

Due to water scale etching the current fixtures and water system at San Bernardino location technician recommended “tri-annual service” as monthly reoccurring service Customer requested repair for PT restroom sensor faucet Technician rebuilt existing fixture twice before coming to the conclusion that unit should be replaced again Technician recommended reschedule while a new Faucet was being ordered Install new faucet with electronic sensor and mixing valve Technician serviced faucet Tech recommended replacement due to buildup in faucet solenoid Install new faucet with electronic sensor and mixing valve Customer requested repair for PT restroom sensor faucet due to water dripping on the counter continuously Technician rebuilt existing fixture and recommended replacement Due to harsh water quality Due to water quality, technician recommended Faucet replacement


Bob O.

Bob O. Job Checkin

Performed inspection at San Bernardino location. Patient room1: sink faucet functional as designed. 1/4 turn angle stops functioning as designed. Drain properly functioning Patient room2: sink faucet functional as designed. 1/4 turn angle stops functioning as designed. Drain properly functioning Water heater closet: water heater functioning as designed, notice of corrosion at nipples of exiting water of heater. Water heater recirculating pump functioning as designed. Mop sink draining as designed. Mop sink faucet functioning s designed. Lab: Faucet: Sink faucet functional as designed. 1/4 turn angle stops functioning as designed. Drain properly functioning. Eye wash station working properly. And at desired temperature. Bullpen: sink faucet functional as designed. 1/4 turn angle stops functioning as designed. Drain properly functioning. Eye wash station functioning as designed. Bull pen kitchen faucet must be replaced. Bathroom: sink faucet functional as designed.has flow rati


Bob O.

Bob O. Job Checkin

Replacement of 1 eye wash station in the lab of San Bernardino Followed by a remove and rebuild of lav faucet in pt restroom.


Bob O.

Bob O. Job Checkin

Leak


Bob O.

Bob O. Job Checkin

ReplCed mix it valve u dear eye wash station mix it default by manufacturer. Open and cleared out debri from pt restroom faucet. I tube was not functioning. Cleaned and reassembled working as designed


Bob O.

Bob O. Job Checkin

Tri annual report Patient Room 1 - Notice of corrosion on angle stops. Exercised shut offs on angle stops. Faucet was replaced.Drain functioning as designed. Patient Room 2 - Notice of corrosion on angle stop. Exercised shut off on angle stops. Faucet was replaced.Drain functioning as designed. Patient Room 3- Notice of corrosion on angle stops. Exercised shut offs on angle stops. Faucet was replaced.Drain functioning as designed. Restroom1 - Notice of corrosion on angle stop. Exercised shut offs on angel stops. Faucet functioning as designed. Drain functioning as designed.Toilet functioning as designed. Lab Room - Notice of corrosion on angle stop.Exercised shut offs on angel stops. Faucet functioning as designed. Eye wash station has low pressure recommend replacement of mix-it valve immediately. Pt prep Room - Notice of corrosion on angle stop. Exercised shut offs on angel stops, Faucet functioning as designed.Drain functioning as designed. Bullpen - Notice of corrosion on angle


Bob O.

Bob O. Job Checkin

Leak Detection Report Main copper manifold was behind washing machine, three-quarter main feed to master bathroom, connecting other two restrooms for a total of three restrooms. Reroute water line to avoid damage to the tile floors in the kitchen. We will need to cut approx. Ten 12x12 drywall holes. Video Attached for reroute path from manifold to manifold. Tech recommended to avoid damage to the tile floors. Cold water line was capped off to stop the leak. We had to reconnect it so they have water. Customer is going to leave the water off to the house and turn it on to fill up the toilets with water to use the bathroom.


Bob O.

Bob O. Job Checkin

Plumber


Bob O.

Bob O. Job Checkin

Technician perform live detection at home Technician started off with whole home pressure test. Failed. Technician, then use acoustic lead to talk to machine to locate point of interest. POI was behind washing machine, three-quarter main feed to master bathroom, connecting other two restrooms for a total of three restaurants. Perform cut and cap on three-quarter line line located. Perform pressure test held. Burst waterline on three-quarter cold. Feed to rest of home.


Bob O.

Bob O. Job Checkin

Monthly Inspection Patient side restroom functioning as designed Patient Room Torpido - Noticed corrosion on angle stops. Faucet working as designed. Drain working as designed. Patient Room bel-air - Noticed corrosion on angle stops. Faucet working as designed. Drain working as designed. Water Heater Room - Functioning as designed. Bullpen Room - Faucet working as designed. Drain is working as designed. Eye wash station needs rebuild or replacement . Urgent eyewash station needs to be rebuilt or replaced and remounted also needs drain cleared Lab room - Faucet working as designed. Drain has to get snaked out due to slow drain. Eye wash station functioning as designed . Urgent eye wash station needs to be rebuilt to replaced and remounted Kitchen -functioning as designed PT Prep Room - Noticed corrosion on angle stops. Faucet working as designed. Drain is working as designed. PT Restroom - Noticed corrosion on angle stops. Faucet working as designed. Drain is working as