5170 Fulton Dr. Suite C
Fairfield, CA 94534
707-310-0602

Local Reviews
for alamo, ca

Rated 5.0 out of 5 stars based on 2 customer reviews

Very Professional, Competitive and Friendly

We had a great experience with Bay Area Underpinning. Everything was done they said they would do, and they gave us updates throughout the process. We had one little snag and they addressed my concerns. I would recommend them HIGHLY.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Great service very reasonable price and polite prople

I called them once, they came and gave me quote in one day and scheduled it real quick add did the a big job in 3 days. They did all the work from crawl space which is hard to work on your belly all day for 3 days. I recommend this company.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Job Locations
for alamo, ca

James B.

James B. Job Checkin

Waiting on Building inspector to finalize recently completed 6 resistance pier project with poly injection to stabilize the foundation and level the floor.

Waiting on Building inspector to finalize recently completed 6 resistance pier project with poly injection to stabilize the foundation and level the floor.

Brian K.

Brian K. Job Checkin

Lifted side of garage with steel piers to re-level it. Used polyurethane foam to fill void underneath garage slab in order to support the floor. Replaced removed concrete on walkway.


Jose I.

Jose I. Job Checkin

Sprinkler line connected back

Sprinkler line connected back

Jose I.

Jose I. Job Checkin

Drain pipe and rock

Drain pipe and rock

Jose I.

Jose I. Job Checkin

Lifted and ready to backfill

Lifted and ready to backfill

Noe P.

Noe P. Job Checkin

New job, new home that needs to be lifted, and stabilized

New job, new home that needs to be lifted, and stabilized

Juan G.

Juan G. Job Checkin

In Alamo putting in build ups the holes are dug the cages are in and ready for concrete pour


Juan G.

Juan G. Job Checkin

Alamo cut and filled almost ready for lift


Juan G.

Juan G. Job Checkin

At the Alamo removing concrete with the Hilti 3000


Juan G.

Juan G. Job Checkin

Day one Alamo job .Home owner asked us to save the trees in this case it worked out perfectly we just removed a few branches and snuggled are bracket right were it needed to be


James B.

James B. Job Checkin

Waiting on county building inspector to finalize recently completed 24 resistance pier project.

Waiting on county building inspector to finalize recently completed 24 resistance pier project.

Juan G.

Juan G. Job Checkin

Lift day today ! After all piers are installed to the foundation in accordance with plans ,we than connect our cylinders and a cap which are held down by connecting to the all threads . Than hoses are connected to the manifold,hose to the pump . Than ready to lift


Wilford  C.

Wilford C. Job Checkin

Site safety check.

Site safety check.

Juan G.

Juan G. Job Checkin

Pushing pipe today on pier #3 . Lifting an edition down 4 to 5 inches in most area .


Alejandro  V.

Alejandro V. Job Checkin

Digging 8 piers today. Ecp 300 brackets