Final inspection complete and that wraps up this big commercial job in Davis.
Mid lift update, clear void between dirt and existing foundation showing a clear representation of the current lift
Partial backfill done today to make final clean up much easier and faster
350 series bracket fully prepped and ready for lift day
In Davis, CA pushin 350s push piers . Foundation lifting and stabilize with a total of 70 push piers. 🏚💪
350 series bracket fully prepped and ready to lift
Dug 40, mounted 40, bolted 40 ecp 350 brackets truck 31
350 series brackets fully prepped and ready for lift.
350 ram and stand. We use this to drive our pier to depth for the resistance needed to do our lifts
Waiting on Building inspector to finalize recently completed 22 resistance pier project with adjustable floor supports to level the floor.
Waiting on Building inspector to finalize recently completed 22 resistance pier project with adjustable floor supports to level the floor.