5170 Fulton Dr. Suite C
Fairfield, CA 94534
707-310-0602

Local Reviews
for petaluma, ca

Rated 5.0 out of 5 stars based on 1 customer reviews

All Shall Rise

The pool surround in our backyard had multiple cracks due to a variety of reasons. We decided to lay new concrete over it. We verified there may be voids under the slab that would contribute to more problems down the road. After due diligence we came to the conclusion foam injection was the best way to achieve our goals without ripping the existing concrete out and starting over minus the $$$ it would entail. Research led us to Bay Area Underpinnings. Hence bright and early one morning Brian and Joe pulled up and made all our fantasies come true! We now can resurface on top of the existing surround with confidence. Nothing but praise here.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Job Locations
for petaluma, ca

Ronald H.

Ronald H. Job Checkin

Backfilled after successful lift

Backfilled after successful lift

Ronald H.

Ronald H. Job Checkin

Ready for lift

Ready for lift

Ronald H.

Ronald H. Job Checkin

Pier pushed,cylinder setup for lift

Pier pushed,cylinder setup for lift

Brian K.

Brian K. Job Checkin

Lifted pool decking and filled void with polyurethane foam.

Lifted pool decking and filled void with polyurethane foam.

Brian K.

Brian K. Job Checkin

Lifted porch with polyurethane foam to fix settlement and fill voids underneath.

Lifted porch with polyurethane foam to fix settlement and fill voids underneath.

Richard S.

Richard S. Job Checkin

Ensuring our model 300 crawlspace piers are level utilizing high strength non shrink grout.

Ensuring our model 300 crawlspace piers are level utilizing high strength non shrink grout.

Richard S.

Richard S. Job Checkin

Driving our model 300 push pier to load bearing strata to facilitate lift and stabilization

Driving our model 300 push pier to load bearing strata to facilitate lift and stabilization

Richard S.

Richard S. Job Checkin

Excavating our model 300 crawlspace piers for proper installation

Excavating our model 300 crawlspace piers for proper installation

Richard S.

Richard S. Job Checkin

Properly installed push pier bracket ready for bolting. Then driving of the pier its self.

Properly installed push pier bracket ready for bolting. Then driving of the pier its self.

Richard S.

Richard S. Job Checkin

Excavating to properly install our model 300 earth contact products push piers

Excavating to properly install our model 300 earth contact products push piers