5170 Fulton Dr. Suite C
Fairfield, CA 94534
707-310-0602

Local Reviews
for sacramento, ca

Rated 5.0 out of 5 stars based on 2 customer reviews

Excellent Service and Workmanship!!

Loved working with Bay Area Underpinning! From day one, they were professional, timely, and provided excellent communication throughout the entire process! The guys were always on time, and courteous! They gave us updates on timelines and information on what to expect! Most importantly, their quality of work was superb!

  • Overall Experience
  • Quality
  • Price
  • Convenience

79 Kelso circle Sacramento

Great company start on time finish on time employees were great.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Job Locations
for sacramento, ca

James B.

James B. Job Checkin

Another recently completed and finalized project with 24 resistance piers to stabilize the foundation and level the floor.

Another recently completed  and finalized project with 24 resistance piers to stabilize the foundation and level the floor.

James B.

James B. Job Checkin

Just finalized recently completed 5 resistance pier project with poly injection to level the Garage.

Just finalized recently completed 5 resistance pier project with poly injection to level the Garage.

Ronald H.

Ronald H. Job Checkin

Backfill and cleanup finished in Sacramento. Messy job but you’d never even know we were here

Backfill and cleanup finished in Sacramento. Messy job but you’d never even know we were here

Ronald H.

Ronald H. Job Checkin

Completed yet another successful lift with out push piers in Sacramento, CA

Completed yet another successful lift with out push piers in Sacramento, CA

Lance S.

Lance S. Job Checkin

Cutting and capping Piers to get ready for lift.


Ronald H.

Ronald H. Job Checkin

300 series bracket mid pushing process. Driving down till we hit bedrock or greater resistance.

300 series bracket mid pushing process. Driving down till we hit bedrock or greater resistance.

Ronald H.

Ronald H. Job Checkin

300 series bracket just pushed ands ready to be cut, filled and capped in preparation for lift day

300 series bracket just pushed ands ready to be cut, filled and capped in preparation for lift day

Ronald H.

Ronald H. Job Checkin

Excavating and mounting brackets to lift and stabilize structure

Excavating and mounting brackets to lift and stabilize structure

Ronald H.

Ronald H. Job Checkin

Concrete poured back after successful lift

Concrete poured back after successful lift

Ronald H.

Ronald H. Job Checkin

Excavating hole to mount brackets

Excavating hole to mount brackets

James B.

James B. Job Checkin

Waiting on Building inspector to finalize recently completed 18 resistance pier project with adjustable floor supports to stabilize the foundation and level the floor.

Waiting on Building inspector to finalize recently completed 18  resistance pier project with adjustable floor supports to stabilize the foundation and level the floor.

Ronald H.

Ronald H. Job Checkin

Angle iron and 300 series bracket combo successfully mounted to bottom of the fireplace.

Angle iron and 300 series bracket combo successfully mounted to bottom of the fireplace.

Ronald H.

Ronald H. Job Checkin

Mid excavation of a 300 series bracket hole that will be paired with angle iron to support full width of the fire place

Mid excavation of a 300 series bracket hole that will be paired with angle iron to support full width of the fire place

Alejandro  V.

Alejandro V. Job Checkin

Back fill and final inspection with reconnecting gas line and water line.


Alejandro  V.

Alejandro V. Job Checkin

Lift and install 5 screw jacks

Lift and install 5 screw jacks