Emergency pull down and inspection of C-2 on the industrial refrigeration system
Installed compressor motor on the industrial refrigeration system
To Perform On Site Inspection on control system for the ammonia refrigeration system
replaced two transducers for discharge and suction on compressor 1 as part of industrial refrigeration system
Pump down vessel and replace relief valves and piping on industrial refrigeration system
Trouble shoot safety relief valve on industrial refrigeration system
Repaired ammonia leak in evaporator pan in dry storage of Ammonia Refrigeration System
Completed the Shaft Seal replacement and changed out the two back end cap O-rings to the Compressor on the Ammonia Refrigeration System