ESA 1-2 Maintenance performed today. Client activated maintenance plan today. Checked system operations. Flushed drain line with green cleaner and water to remove blockage. Installed pan treatment to help prevent future clogs. Sanitized/deodorized indoor coils. We will shampoo the outdoor coils on the next visit. Replaced 20x20x4 air filter with new. System operations normal.