Noah did his best to assist us. Also, when the office was contacted, Stephanie and other office personnel were very helpful.
REPAIRED EXPOSED WIRING FOR THE POLE LIGHTS, INSTALLED (2) 20AMP GFI RECEPTACLES FOR THE BASKETBALL COURT, INSTALLED (2) PHOTOCELLS FOR THE POLE LIGHTS, AND VERIFIED ALL OTHER LIGHTING CHECKED GOOD. TESTED FOR PROPER OPERATION.
REPLACED (1) HEATER/VENT/LIGHT IN THE BATHROOM. TESTED FOR PROPER OPERATION.
Completed a one time tune up for 1 heating unit.
CHECKED HEATING UNIT AND FOUND A FAULTY HEAT SEQUENCER. REPLACED SEQUENCER AND TESTED HEATING UNIT.
TO INSPECT ELECTRICAL FOR THE GAZEBO AREA [PHASE 1]. INSTALLED (4) 15AMP GFI RECEPTACLES. TESTED FOR PROPER OPERATION. NOTE: THE TECHNICIAN CONFIRMED THE GAZEBO AREA IS UP TO CODE.
REPLACED FAN MOTOR AND PRESSURE SWITCH FOR HEATING UNIT.
GENERATOR SERVICE & CONTROL BOARD REPLACEMENT