REPAIRED EXPOSED WIRING FOR THE POLE LIGHTS, INSTALLED (2) 20AMP GFI RECEPTACLES FOR THE BASKETBALL COURT, INSTALLED (2) PHOTOCELLS FOR THE POLE LIGHTS, AND VERIFIED ALL OTHER LIGHTING CHECKED GOOD. TESTED FOR PROPER OPERATION.