Remove both water heaters from in ceiling/tie both hot lines into the existing 3/4 hot from new tankless that is already in service. Cap off both cold lines that run to the water heaters. Remove electrical from both water heaters and install in box with blank plate. Install 2 ball valves one for each bathroom run. Checked for leaks while onsite none present.