Arrived on site to meet with Kevin and Brad Caldwell (2M Company). Performed basic overview inspection of water treatment system. Tested Post water treatment Ph = 6 Iron = .4ppm Hardness = 0 grains Tested Pre water treatment Ph = 6.7 Iron = 6ppm Hardness = 5 grains 12-12-2021 provided customer with pricing for system upgrades