We pulled the toilet from the powder bath and installed it in the guest bathroom we had to do some modifying of the flange because there was mortar gunked in the rails and with the new thickness of the floor we had to install longer toilet box. In the master bathroom and install longer toilet parts also because of the floor and then reassemble the toilet that was removed from there previously we turned the water on antacid both toilets as of right now there are two working toilets