Final Phase- Install Trim for bathroom remodel Turned water off to the house and drained the system Cut the 5 copper stub-outs and installed 1/2” escutcheon’s and quarter turn isolation valves Cut the 1-1/2” pvc trap arms and glue adaptors on to both of the stub-outs Unboxed and mounted both vanity faucets and install the spring pop-up assembles Cut to length new p-traps for both sinks Connected new valves to faucets with no-burst stainless steel flex supply lines The toilets flange sits above the finished floor, we had to cut the flange out and grind out the tiles and the grout to get the flange lowered to below finished floor. Installed a new PVC flange and attached to the exciting system in the basement Also in the basement we had to install the 2” p-trap, on previous visit we cut in a trap arm for the future shower, this visit we connected the showers trench drain to the trap-arm In the shower we installed all of the trim this meant, inserting the valves cartridge inside the valv