1900 Railroad Ave
Mt Vernon, WA , WA 98273
360-219-9468

Job Locations
for concrete, wa


Map of Concrete WA
Brannigan B.

Brannigan B.


Job Checkin

Completion of the install of new back flow device and water meter. New meter is 7 inches longer than the previous one, this made it so the fill arm hits up against the metal edge of the doors opening. I fabricated a 3 layer protective sleeve out of pvc pipes and rubberized pvc fernco and hose clamps. City turn the water back on and we tested for leaks. They’re was a drip out of the compression nut on the first ball-valve, i removed the handle and tightened it up and the drip stopped. Recommendation get power to the box so a heat source can keep the valves, meter and backflow device from freezing.