Final city inspection passed: HVAC, 2 heat pumps and 2 air handlers installation
Final city inspection passed: electrical, EV charger installation +DCC, 50A breaker
Final city inspection passed: EV charger installation, 60A breaker
Final city inspection passed: heat pump and air handler installation
Final city inspection: heat pump water heater installation
Final city inspection: two heat pumps and two air handlers installation
Final city inspection passed: furnace and heat pump installation, HVAC
Generac generator on 24 kW has been installed by FUSE HVAC
Generac generator on 24 kW has been installed by FUSE HVAC
Performed maintenance on the SolarEdge inverter. Completed work on modem replacement
Had the solar system serviced. Replaced the old meter with a new one
Had the solar system serviced. Replaced the old meter with a new one