Installed Payne heat pump. Installed Ecobee thermostat. Installed new supply and return plenums. Sealed all connections with mastic. Replaced secondary drain pan. Installed SS2 and SS3 safety switch. Rebuilt primary and secondary drain. Cleared drain and ensured operation. Pressure tested lineset and pulled a vacuum. Charged system to meet manufacturer specifications. Everything is working at completion of service.