Installed new variable speed blower motor at the indoor air handler. Cleaned blower wheel and blower housing at no additional charge to ensure proper airflow. Secured wiring harness to motor head connection. Performed airflow verification test, confirmed system was operating at a .20inWC static pressure. Tested and verified the system was operating within manufacturer specifications for operation. Everything is working at this time.