Installed new Lennox evaporator coil. Installed new liquid line filter drier in attic. Added extra foam block support on supply plenum. Sealed ductwork connections with mastic and hardcast. Pressure tested system with nitrogen and pulled vacuum. Cleared primary drain with CO2 and primed trap with water. Charged AC with R-410A refrigerant. Tested operation of system. Everything is working at completion of service.