Responded to water leak issues across multiple buildings. Installed new auto fill mechanism on boiler system in maintenance shed after isolating air scoop and draining pressure. Relocated humidifier after filtration system, including cutting in a new valve and running new supply line. Cleaned filter rack and noted potential need for T/P valve replacement, which client will monitor.
Successfully relocated two thermostats in the pickleball cottage per client's (Eric) request, moving them from their original position to the adjacent wall where the alarm panel is located. All connections were properly terminated and system operation was verified after relocation.