Richard performed periodic maintenance on our gas high-efficiency boiler. Richard is highly professional, experienced, and communicative, explaining with photos and words what he will and has done. Having worked with Innovative for 10 years, I’m continually impressed by the depth of Innovative’s bench. But Richard has quickly become my preferred technician!
Overall Experience
Quality
Price
Convenience
Got my air conditioner working again, far better than it worked before. Very pleased with the professionalism and attention to detail of the service techs. Thanks guys.
Overall Experience
Quality
Price
Convenience
I’m always impressed by Innovative’s technicians, but Gary is definitely my first choice for any kind of HVAC service.
Overall Experience
Quality
Price
Convenience
Overall Experience
Quality
Price
Convenience
I returned to install a condensate neutralizer pump. I proceeded to disassemble the defective condensate pump. Clean and prepare the work area. I proceeded to install the new condensate neutralizer pump NBT-400P. I concluded with the installation of the new condensate pump NBT-400P. I inserted the neutralizer pellets in the new pump. Add clean water in ml new condensate pump. The pump discharged the water correctly. Concludes with the installation of the new condensate pump NBT-400P. Next I proceeded to do the heater exchanger cleaning in the WeilMclain Ultra high efficiency boiler. Disassemble the front cover of the heater exchange. I proceeded to clean with a metal brush and suck the dirty h the cardboard residues of the heater exchanger with the vacuum. I cleaned, cleaned and shone the heater exchanger of this unit. I proceeded to install all the gaskets and gaskets necessary for the cellar and secure the front cover of the heater exchanger. I pressed and secured the f
Hight Efficiency gas boiler/AHUs X1 Gas Boiler. X1 Indirect hot water tank. X2 AHUs / Hydro coils. Perform a tune-up and cleaning to help ensure reliable and safe operation. Inspect for cracks & deterioration of Heat Exchanger. Check and clean Burners an heat exchanger- ok, vacuumed-ok Checked and cleaned flame sensor and ignition Assembly-ok Check Safety Controls-ok Check electrical wiring and components-ok Check Gas valve & Gas Line-ok Check Combustion Air & Exhaust, intake lines-okay Check GVD Damper-N/A Check Temperatures & Water pressure settings; Performance-ok Check and run Thermostats- operating well at this moment. Check circulation pumps-ok Check and clean NT1-P condensate pump and drain line-okay Neutralizer mineral pellets- replace on this occasion. Check and run indirect hot water tank -ok Check for water leak,no leakage at this moment Check and clean condensation trap of the boiler-ok Check for water leak, no leakage at this moment. -/-/-/-/-/- NOTE: The NT1-P condensate
Completed maintenance on 4 central a/c systems 3 daikin units and 1 carrier system. There are 5 systems total in the home. The 1st floor system air handler is located in the nanny‘s quarter’s above the ceiling. 2nd, 3rd and 4th fl air handlers are located in hallways above the ceiling. The last air handler is located on the top floor closet above the ceiling. The 1st floor system and the 2nd floor system are older r-22 units. The 2nd floor system is low on r-22 refrigerant this system is outdated and past it’s life expectancy system needs replacement. On arrival the 1st floor system was not operating properly the indoor unit was blowing air but not cold. Found the breaker to the condenser on the roof was tripped. the breaker panel is located on the roof near the condensers. All operations and pressures were checked and all outdoor condenser coils were washed with a hose there is water access on the roof near roof access door. All units besides the 2nd floor system are operating
Return to replace compressor for system that serves the bedroom area. Reclaimed all of the refrigerant from the system removed compressor and installed a new compressor under warranty. System was pressurized with nitrogen and no leaks were present. pulled a vacuum and recharged system to factory charge with 9lbs 5 oz of 410a. Ran system and monitored pressures. Supply temperature is around 50 degrees with a return temperature of 74 degrees. Unit is operating properly repair is completed. View visual findings from this job here - https://visionshare.xoi.io/?id=XA-A3D0-928EBD669AB3455792E7DB8CE66C1D98
ActivePure Air Scrubber installation for MD’s busy office.
New AC high velocity installation with Unico System and Trane.
Unico High Velocity System estimate in New York City