PERFORMED CMA INSPECTION ON 11 GEOTHERMAL SYSTEMS AND 1 MINI SPLIT SYSTEM. TECH COMPLETED A LEAK DETECTION SEARCH ON ALL EVAPORATOR COILS, THERE WERE NO LEAKS FOUND. TECH CHECK CAPACITOR RATINGS AND COMPRESSOR AND BLOWOR MOTOR AMPERAGE, ALL CHECKS WERE INSIDE THE RIGHT SPECIFICATIONS. TECH COMPLETED FILTER CHANGE OF ALL SYSTEMS. ALL SYSTEMS ARE PERFORMING PROPERLY AT THIS TIME.