Plumbing Installation: We will cut out and remove all existing horizontal drain pipes under the crawlspace, expose the sewer under the house, replace all cast iron horizontal drain pipes under the crawlspace using sch40 and pipe and fittings and properly grade and strap all drains for optimal flow.