200 Amp Underground Service Upgrade - SEMI-FLUSH 40 circuit panel SCOPE OF WORK: Phase 1: Install 2 ground rods per code. Run ground wire to the nearest water pipe (usually a hose bib). Phase 2: Remove old meter box from wall. Install new meter box in the same location. Install existing branch circuit wiring into new panel and place on new circuit breakers (AFCI/GFCI breakers will be used as required by your jurisdiction). Update panel labelling. INCLUDED: -Project coordinator will communicate throughout the process -Obtain SDGE service order -Obtain City electrical permit -Arrange city electrical inspections (rough and final) -Arrange re-connection of power with SDGE for the same day -Panel Surge Protector (Required by Code effective 1/1/23) -Stucco patching, as needed, includes weatherproofing, stucco, color match paint, and any city inspections required NOTE: If the wall is wood, a pine frame will be installed around the new box. Painting included if supplied by the homeowner t