Furnished, wired, and installed a dedicated 40 amp 240 volt feed from the panel to the new location of high temp furnace. Furnished, wired, and installed a plug for said furnace. Performed panel maintenance and tightened all connections. We had to cut Sheetrock. We do not patch. Customer receives a discount as per the Electrical manager.