I recently completed a job as an HVAC contractor, installing a new steam boiler. The boiler was four sections, and all piping and electrical were connected through safety switches. The gas piping was also tested to ensure it was working properly. I also made sure that all the connections were secure and that the system was operating at peak efficiency.