1 zinsco panel main lug recall panel due to fire hazard 150 amp 2 main breaker outdoor 150 amp Grounding sistem 2 surge protectors 1 fan install Technician Notes: Day 1 ---> Both outdoor 150 amp main breaker panels are completed. Still need to complete end main lug panel and Install both surge protectors and complete grounding Day 2 ---> Completed the installation of the 150 amp main lug indoor breaker panel with surge protector installed also installed surge protector in additional panel and second home finished outside grounding with the help of Jon. We were able to get the drywall work done after panel was installed, so no drywall patching will need to be done collected payment in full