Lined 4” cast iron sewer line from floor cleanout in janitorial closet approximately 25’ downstream. Lined 4” cast iron sewer line from men’s bathroom floor cleanout approximately 8’ downstream. Reinstated 4 connections. Applied a 3 mil thick coat of epoxy from floor cleanout in woman’s bathroom approximately 25’ downstream.