Provided estimate for replacement of 66 linear feet of failing 4" clay sewer pipe between house and municipal main connection. Scope includes excavation, disposal of existing pipe, installation of new SDR 35 PVC pipe properly sloped and bedded per code. Existing landscape to be removed and replaced with imported topsoil and sod. Concrete sidewalk removal and replacement as needed. Plumbing permit required from city jurisdiction. Full warranty on materials and labor included in estimate.