Installed a 5’ 4x6” patch at the 4-6” connection near manhole. Lined 4” cast iron sewer upstream from open pipe approximately 20’ ending in patch. Reinstated the two connections (cross). Lined 4” cast iron sewer downstream from pulled toilet in men’s bathroom approximately 10’ ending in newly installed cast. Reinstated three connections on that line.