Cleaned and measured sewer in preparation for lining from 6” pvc clean out in front yard (7’5” deep) to city main. Also line from catch basin in back (7’5” deep) to overlap liner from clean out x5 reinstates Lined sewer from 6” pvc clean out 45’ to city main, also lined from catch basin 85’ to liner from clean out, reinstated 5 connection